What the filing says
A public-record reading of the proposed work.
File suspended scaffold outrigger systems for facade restoration and inspection. also install material hoist
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 14-story health facility built in 1973, on a 159,777 sq ft lot.
- Built
- 1973
- Floors
- 14
- Residential units
- 0
- Building type
- Health facility
- Land use
- Public facilities and institutions
- Zoning district
- R7-2
- Lot area
- 159,777 sq ft
- Building area
- 593,427 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 17, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 13 open notices on record for this building, out of 103 notices on file; the most recent was issued Apr 10, 2026.
- Construction
Issued Apr 10, 2026 — FAILURE TO MAINTAIN BLDG. OBSERVED SPALLING/CRACKING CONCRETE SLAB & CRACKING SLAB UNDERSIDE OF BALCONY MULTI LOCATION AT EXPOSURE 1 WEST ELEVATION. OBSERVED SPALLING CRACKING CONCRETE EYEBROW OF BULKHEAD ROOF MULTI LOCATIONS AT ROOF LEVEL. REMEDY: OWNER TO REPLACE AND/OR REPAIR
- Construction
Issued Sep 24, 2025 — FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER AS PER NYC ADMIN CODE AT TIME OF INSPECTION OBSERVED SPALLING STUCCO & MASONRY @ EXPOSURE 1 AT BASE OF NUMEROUS BALCONIES. ALSO OBSERVED AT ROOF CRACKS IN MASONRY ON BULKHEAD AS WELL AS SPALLING BRICK ON BULKHEADS REMEDY: REPAIR AND/OR REPLACE
- Failure to correct swarmp conditions (facade)
Issued Nov 1, 2023 — FAILURE TO CORRECT SWARMP CONDITIONS
10 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 17, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01438871-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 63,690 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01438871-I1
- BIN
- 1063862
- BBL
- 1021600001
- Postal code
- 10040 · 44 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- Empty in the source
- Proposed dwelling units
- Empty in the source