What the filing says
A public-record reading of the proposed work.
Decommission of existing sprint telecom site. remove all antennas and equipment from the roof. no change in use, egress or occupancy. original installation approved under application #301329159.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 22-story condominium built in 1964, with 499 homes, on a 211,538 sq ft lot.
- Built
- 1964
- Floors
- 22
- Residential units
- 499
- Building type
- Condominium
- Land use
- Mixed residential and commercial
- Zoning district
- R6
- Lot area
- 211,538 sq ft
- Building area
- 934,702 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 13, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 30 notices on file; the most recent was issued Nov 14, 2025.
- Low pressure boiler
Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
- Construction
Issued Jan 22, 2025 — VIO25-50443
- Elevator
Issued Jul 3, 2018
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 8, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00448309-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00448309-I1
- BBL
- 3072737501
- Postal code
- 11224 · 857 filings
- Review type
- Standard Plan Examination
- Existing stories
- 42
- Proposed stories
- 42
- Existing dwelling units
- 576
- Proposed dwelling units
- 576