NYC DOB record · M01097317-I1

535 Park Avenue

535 Park Avenue, Manhattan, NY 10065

Alteration filing in Upper East Side-Carnegie Hill, Manhattan. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 22, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01097317-I1

535 Park Avenue

Manhattan, NY 10065

Alteration filing · status dated Sep 18, 2026

Current record
Recorded as completed
Proposed scale
16 stories
Dwelling units
33
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01097317-I1 as a alteration filing at 535 Park Avenue, Manhattan, NY 10065. Its latest published status category is Recorded as completed, dated Sep 18, 2026. The filing records 16 proposed stories and 33 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Sep 18, 2026
Proposed scale
16 proposed stories and 33 proposed dwelling units
The building, not the filingopen housing violations, what it sold for, the owner of record and every filing at BIN 1041961Applicant of recordSee the 82 filings that name Christopher Teeter
FiledAug 21, 2024
Current recordRecorded as completed
Proposed scale16 stories
Recorded cost$75,810

What the filing says

A public-record reading of the proposed work.

Filing herewith drawings to propose an expansion & interior renovation of existing residential apartment # 1j. this application do not require a new or amended certificate of occupancy as there is no change in use, exists or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 15-story elevator apartment building built in 1910, with 31 homes, on a 7,438 sq ft lot.

Built
1910
Last altered
2015
Floors
15
Residential units
31
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R10
Lot area
7,438 sq ft
Building area
86,116 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 22, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 6 open notices on record for this building, out of 42 notices on file; the most recent was issued Aug 6, 2021.

  • Construction

    Issued Aug 6, 2021 — FAILURE TO COMPLY WITH COMMISSIONER'S ORDER #011720CLL0801PR. AS OF 08/06/21 OWNER HAS NOT COMPLIED WITH IMMEDIATE CURE ORDER REMEDY: IMMED COMPLY WITH CODE AND COMMISSIONER'S ORDER

  • Construction

    Issued Jun 10, 2021 — FAILURE TO COMPLY. OM 2/3/20 COMMISSIONER'S ORDER 2320CLL10801OS WAS ISSUED TO OWNER TO HAVE 100% OF BUILDING CORNICES INSPECTED BY A QEWI AS OF 6/7/21 OWNER HAS NOT COMPLED WITH IMMED CURE ORDER. REMEDY: IMMED COMPLY WITH CODE AND COMMISSIONER'S ORDER

  • Construction

    Issued Feb 3, 2020 — AS PER DOB INSPECTION ON 1/17/20 SECTION OF CORNICE IS UNSTABLE AND IN DANGER OF FALLING. REMEDY: OWNER TO IMMED RETAIN NYS LIC PROF. TO CONDUCT 100% HANDS ON INSPECTION OF ALL CORNICES FACING A PUBLIC RIGHT OF WAY TO EVALUATE SAFETY SAME. PROVIDE ENGINEER'S REPORT AND REPAIR DWGS BY 2/28/20. SUBMIT ALL INFO TO FACADE UNIT.FILE & PERMIT ALL WORK

  • 3 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 22, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01097317-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01097317-I1
BBL
1013960001
Review type
Standard Plan Examination
Existing stories
16
Proposed stories
16
Existing dwelling units
33
Proposed dwelling units
33
General construction