What the filing says
A public-record reading of the proposed work.
Removal and installation of plumbing fixtures and related piping on apt 4ab as per plans. no change in egress, use, or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 15-story elevator apartment building built in 1910, with 31 homes, on a 7,438 sq ft lot.
- Built
- 1910
- Last altered
- 2015
- Floors
- 15
- Residential units
- 31
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R10
- Lot area
- 7,438 sq ft
- Building area
- 86,116 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 13, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 6 open notices on record for this building, out of 42 notices on file; the most recent was issued Aug 6, 2021.
- Construction
Issued Aug 6, 2021 — FAILURE TO COMPLY WITH COMMISSIONER'S ORDER #011720CLL0801PR. AS OF 08/06/21 OWNER HAS NOT COMPLIED WITH IMMEDIATE CURE ORDER REMEDY: IMMED COMPLY WITH CODE AND COMMISSIONER'S ORDER
- Construction
Issued Jun 10, 2021 — FAILURE TO COMPLY. OM 2/3/20 COMMISSIONER'S ORDER 2320CLL10801OS WAS ISSUED TO OWNER TO HAVE 100% OF BUILDING CORNICES INSPECTED BY A QEWI AS OF 6/7/21 OWNER HAS NOT COMPLED WITH IMMED CURE ORDER. REMEDY: IMMED COMPLY WITH CODE AND COMMISSIONER'S ORDER
- Construction
Issued Feb 3, 2020 — AS PER DOB INSPECTION ON 1/17/20 SECTION OF CORNICE IS UNSTABLE AND IN DANGER OF FALLING. REMEDY: OWNER TO IMMED RETAIN NYS LIC PROF. TO CONDUCT 100% HANDS ON INSPECTION OF ALL CORNICES FACING A PUBLIC RIGHT OF WAY TO EVALUATE SAFETY SAME. PROVIDE ENGINEER'S REPORT AND REPAIR DWGS BY 2/28/20. SUBMIT ALL INFO TO FACADE UNIT.FILE & PERMIT ALL WORK
3 further open notices are on file. Open the source dataset for the full list.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 12, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01364452-S2.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01364452-S2
- BBL
- 1013960001
- Postal code
- 10065 · 258 filings
- Review type
- Standard Plan Examination
- Existing stories
- 16
- Proposed stories
- 16
- Existing dwelling units
- 33
- Proposed dwelling units
- 33








