NYC DOB record · M00605550-I1

541 Lexington Avenue

541 Lexington Avenue, Manhattan, NY 10022

Alteration filing in East Midtown-Turtle Bay, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 29, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M00605550-I1

541 Lexington Avenue

Manhattan, NY 10022

Alteration filing · status dated Oct 27, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
697
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M00605550-I1 as a alteration filing at 541 Lexington Avenue, Manhattan, NY 10022. Its latest published status category is Approved, dated Oct 27, 2026. The filing records 697 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Oct 27, 2026
Proposed scale
697 proposed dwelling units
The building, not the filingopen housing violations, what it sold for, apartment sizes and every filing at BIN 1036441Applicant of recordSee the 1866 filings that name Paul Perdek, PROF. ENG. PLLC
FiledOct 26, 2021
Current recordApproved
Proposed scale697 units
Recorded cost$1

What the filing says

A public-record reading of the proposed work.

Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 15-story hotel built in 1929, on a 24,725 sq ft lot.

Built
1929
Last altered
2013
Floors
15
Residential units
0
Building type
Hotel
Land use
Commercial and office
Zoning district
C6-6
Lot area
24,725 sq ft
Building area
317,496 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 29, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 6 open notices on record for this building, out of 190 notices on file; the most recent was issued Mar 27, 2026.

  • Construction

    Issued Mar 27, 2026 — FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. AT EXPOSURE 1, VERTICAL CRACK ALONG WITH MISSING BRICK & SPALLING AT DECORATIVE STONE EXP2:CRACKS ON THE BRICK & DECORATIVE STONE & CORRODED WINDOW LINTEL EXP3:DAMAGED & SPALLED BRICK AT MULTIPLE LOCATIONS.EXP4: SPALLING BRICK OBSERVED. REMEDY: REPAIR AND/OR REPLACE

  • Construction

    Issued Aug 11, 2025 — FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.AS NOTED AT TI ME OF INSPECTION,OBSERVED ON EXPS1,2,3,4 CORRODED METAL LINTELS ON MUL TIPLE FLOORS.EXP1 WEST:SPALLING,DEFECTIVE STUCCO AT MULTIPLE FLOORS.CR ACKS IN ARCH MASONRY ON 16TH FL.EXP2 NORTH ELEV:SPALLED BRICKS DEFECTI VE,CRACKED BRICKS ON MULTIPLE FLOORS.REMEDY:REPAIR AND/OR REPLACE

  • Hazardous condition (facade)

    Issued Jan 12, 2022 — CYCLE 9A UNSAFE REPORT FILED

  • 3 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 28, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M00605550-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “Permit Entire.”

    03

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 88,832 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M00605550-I1
BBL
1013040020
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
697
Proposed dwelling units
697
Sidewalk shed