What the filing says
A public-record reading of the proposed work.
Installation of 300psf sidewalk shed as per plans. all equipment shall comply with ch #33 of the NYC code 2022. no change in use, occupancy or egress under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 5-story walk-up apartment building built in 1930, with 8 homes, on a 1,820 sq ft lot.
- Built
- 1930
- Floors
- 5
- Residential units
- 8
- Building type
- Walk-up apartment building
- Land use
- Walk-up apartments
- Zoning district
- R7A
- Lot area
- 1,820 sq ft
- Building area
- 7,083 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 10, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 9 notices on file; the most recent was issued Mar 1, 2024.
- Construction
Issued Mar 1, 2024 — OBSERVED IN CELLAR, INSTALLATION OF 3 STEEL 6" COLUMNS UNDER THE SEVER LEY ROTTED GIRDER; NOT INDICATED IN APPROVED PLANS. STRUCTURAL STABILT Y CONCERNS WITH WOOD BEAMS, FLOOR JOISTS ALONG WITH IMPROPER WELDING W ORK & IMPROPER WELDING WORK & IMPROPER FOOTING WORK FOR COLUMNS
- Construction
Issued May 3, 1991
- Construction
Issued May 3, 1991
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 9, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01462824-I1.
- Current status updated02
The latest recorded filing status is “Plan Examiner Review.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 86,498 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01462824-I1
- BIN
- 1005101
- BBL
- 1004020044
- Postal code
- 10009 · 295 filings
- Review type
- Standard Plan Examination
- Existing stories
- 5
- Proposed stories
- 5
- Existing dwelling units
- 9
- Proposed dwelling units
- 9