What the filing says
A public-record reading of the proposed work.
Filing herewith for facade restoration . there is no change to use, egress, or occupancy
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 3-story mainly residential with some commercial built in 1940, on a 2,090 sq ft lot.
- Built
- 1940
- Floors
- 3
- Residential units
- 1
- Building type
- Mainly residential with some commercial
- Land use
- Mixed residential and commercial
- Zoning district
- R8B
- Lot area
- 2,090 sq ft
- Building area
- 3,680 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 20, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 2 notices on file; the most recent was issued Jan 9, 2026.
- Construction
Issued Jan 9, 2026 — FTC W/COMMISSIONER'S ORDER CONTROL#348034 VIO#122225PI10301AG DATED 12/22/2025 REQUIRING OWNER TO PROVIDE A CORRECTIVE ACTION PLAN BY 12/29/2025. AS OF 01/09/2026 THE REQ'D CAP WAS NOT REC'D. IMMED COMPLY W/COMMISSIONER'S ORDER CONTROL#348034 VIO#122225PI10301AG
- Construction
Issued Dec 22, 2025 — CORRECTIVE ACTION PLAN REQ'D-BRICK MASONRY FACADE EXP1 AND STUCCO MASONRY @ EXP2. EXP1:CRACKED STONE HEADER @ THE ENTRANCE. VERT STEP CRACK BTWN THE STONE HEADER & 2FL WINDOW SILLS,DISLODGE BRICK BTWN 2FL&3FL. OWNER TO IMMED RETAIN REG DESIGN PROF IN GOOD STANDING W/DOB& NYS TO EVAL BLDG & SUBMIT A CORRECTIVE ACTION PLAN
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01386099-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01386099-I1
- BIN
- 1004492
- BBL
- 1003760043
- Postal code
- 10009 · 148 filings
- Review type
- Professional Certification
- Existing stories
- 3
- Proposed stories
- 3
- Existing dwelling units
- 1
- Proposed dwelling units
- 1








