NYC DOB record · B00505941-I1

545 Lexington Avenue

545 Lexington Avenue, Brooklyn, NY 11221

Alteration filing in Bedford-Stuyvesant (East), Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 14, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00505941-I1

545 Lexington Avenue

Brooklyn, NY 11221

Alteration filing · status dated Jul 24, 2023

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
2
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00505941-I1 as a alteration filing at 545 Lexington Avenue, Brooklyn, NY 11221. Its latest published status category is Recorded as completed, dated Jul 24, 2023. The filing records 2 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Jul 24, 2023
Proposed scale
2 proposed dwelling units
Complete building dossierView all 3 filings associated with BIN 3050541Applicant of recordSee the 1041 filings that name Ashraf Corp
FiledMay 15, 2021
Current recordRecorded as completed
Proposed scale2 units
Recorded cost$6,000

What the filing says

A public-record reading of the proposed work.

Installation ofmedium duty pipe scaffolding as per plans. no change in use occupancy or egress under this application. pipe scaffolding shall comply with chapter 33 of the 2014 NYC building code.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

Violation record

Are there open violations here?

No open violations are recorded for this building.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00505941-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “LOC Issued.”

    03
  4. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    04

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00505941-I1
BBL
3018010053
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
2
Proposed dwelling units
2