What the filing says
A public-record reading of the proposed work.
Installation of overhead protection shed as per plans. shed shall comply with chapter #33 of the 2014 code. no change in use, egress or occupancy under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 16-story elevator apartment building built in 1925, with 96 homes, on a 11,875 sq ft lot.
- Built
- 1925
- Last altered
- 1985
- Floors
- 16
- Residential units
- 96
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R10A
- Lot area
- 11,875 sq ft
- Building area
- 131,690 sq ft
- Historic district
- Riverside-West End Historic District Extension I
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 10, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 14 open notices on record for this building, out of 81 notices on file; the most recent was issued Sep 10, 2025.
- Construction
Issued Sep 10, 2025 — FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE.NOTE OBSERVED MULTIPLE MI SSING STONES AT EXP1 AT MULTIPLE LOCATIONS.AT ROOF OBSERVED DAMAGED CO PING STONES AT MULTIPLE LOCATIONS.REMEDY:REPAIR AND/OR REPLACE
- Fail to certify class
Issued Jul 7, 2021 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
- Fail to certify class
Issued Jul 7, 2021 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
11 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M08009741-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 61,761 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M08009741-I1
- BIN
- 1033941
- BBL
- 1012480029
- Postal code
- 10024 · 267 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 96
- Proposed dwelling units
- 96