What the filing says
A public-record reading of the proposed work.
1. Provide steam condensate returning pump, associated piping and Controls. 2. Provide pre-fabricated enclosure with heating and ventilation system for the pump 3. Replace existing kitchen hood exhaust system with a new system.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 15-story elevator apartment building built in 1954, with 352 homes, on a 175,488 sq ft lot.
- Built
- 1954
- Floors
- 15
- Residential units
- 352
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R7-2
- Lot area
- 175,488 sq ft
- Building area
- 310,551 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 10, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 4 open notices on record for this building, out of 15 notices on file; the most recent was issued May 21, 2025.
- Construction
Issued May 21, 2025 — PARTIAL VACATE ORDER DUE TO: SPALLED/SPALLING CONCRETE BALCONY SLAB ON 9TH FL HANGING ABOVE 8TH FL BALCONY AT EXPOSURE #2 WEST ELEVATION CONDITION POSES A HAZARD TO TENANTS OF 8TH FLOOR BALCONY. REMEDY: VACATE ENTIRE 8TH FLOOR BALCONY AT EXPOSURE #2 WEST ELEVATION RESTRICT ACCESS TO VACATED AREAS
- Construction
Issued May 13, 2025 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.AS NOTED AT TIME OF INSPECTION,OBSERVED ON EX2 WEST ELEV,SPALLING,CRACKED BALCONY SLAB ON THE 9TH FLOOR.EXP4 EAST ELEV,LOOSE PARAPET COPING METAL FLASHING AT ROOF DECK LEVEL.REMEDY:REPAIR AND/OR REPLACE DAMAGED FACADE AND APPURT ENANCES
- No report and / or late filing (facade)
Issued Feb 22, 2023 — FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
1 further open notice is on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 10, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M00491031-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 78,679 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M00491031-I1
- BIN
- 1082659
- BBL
- 1016080023
- Postal code
- 10029 · 372 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 112
- Proposed dwelling units
- 112








