NYC DOB record · M00326379-I1

55 East 102 Street

55 East 102 Street, Manhattan, NY 10029

Alteration filing in East Harlem (South), Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 28, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M00326379-I1

55 East 102 Street

Manhattan, NY 10029

Alteration filing · status dated Oct 26, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
112
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M00326379-I1 as a alteration filing at 55 East 102 Street, Manhattan, NY 10029. Its latest published status category is Approved, dated Oct 26, 2026. The filing records 112 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Oct 26, 2026
Proposed scale
112 proposed dwelling units
The building, not the filingopen housing violations, what it sold for, the owner of record and every filing at BIN 1082659Applicant of recordSee the 336 filings that name Bitopi Consultants LLC
FiledMar 4, 2020
Current recordApproved
Proposed scale112 units
Recorded cost$10,000

What the filing says

A public-record reading of the proposed work.

Installation of new sidewalk shed at 55 east 102 street, manhattan as indicated on plans. there will be no change in the use, egress, or occupancy under this application.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 15-story elevator apartment building built in 1954, with 352 homes, on a 175,488 sq ft lot.

Built
1954
Floors
15
Residential units
352
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R7-2
Lot area
175,488 sq ft
Building area
310,551 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 28, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 4 open notices on record for this building, out of 15 notices on file; the most recent was issued May 21, 2025.

  • Construction

    Issued May 21, 2025 — PARTIAL VACATE ORDER DUE TO: SPALLED/SPALLING CONCRETE BALCONY SLAB ON 9TH FL HANGING ABOVE 8TH FL BALCONY AT EXPOSURE #2 WEST ELEVATION CONDITION POSES A HAZARD TO TENANTS OF 8TH FLOOR BALCONY. REMEDY: VACATE ENTIRE 8TH FLOOR BALCONY AT EXPOSURE #2 WEST ELEVATION RESTRICT ACCESS TO VACATED AREAS

  • Construction

    Issued May 13, 2025 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.AS NOTED AT TIME OF INSPECTION,OBSERVED ON EX2 WEST ELEV,SPALLING,CRACKED BALCONY SLAB ON THE 9TH FLOOR.EXP4 EAST ELEV,LOOSE PARAPET COPING METAL FLASHING AT ROOF DECK LEVEL.REMEDY:REPAIR AND/OR REPLACE DAMAGED FACADE AND APPURT ENANCES

  • No report and / or late filing (facade)

    Issued Feb 22, 2023 — FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023

  • 1 further open notice is on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 27, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M00326379-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “Permit Entire.”

    03

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 88,037 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M00326379-I1
BBL
1016080023
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
112
Proposed dwelling units
112
Sidewalk shed