NYC DOB record · M00491031-P7

55 East 102 Street

55 East 102 Street, Manhattan, NY 10029

Alteration filing in East Harlem (South), Manhattan. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 16, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M00491031-P7

55 East 102 Street

Manhattan, NY 10029

Alteration filing · status dated Oct 13, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
112
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M00491031-P7 as a alteration filing at 55 East 102 Street, Manhattan, NY 10029. Its latest published status category is Approved, dated Oct 13, 2026. The filing records 112 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Oct 13, 2026
Proposed scale
112 proposed dwelling units
The building, not the filingEvery filing at BIN 1082659, with the parcel and violation recordApplicant of recordSee the 22 filings that name Nycha
FiledDec 17, 2025
Current recordApproved
Proposed scale112 units
Recorded cost$20,000

What the filing says

A public-record reading of the proposed work.

1. Provide steam condensate returning pump, associated piping and Controls. 2. Provide pre-fabricated enclosure with heating and ventilation system for the pump 3. Replace existing kitchen hood exhaust system with a new system.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 15-story elevator apartment building built in 1954, with 352 homes, on a 175,488 sq ft lot.

Built
1954
Floors
15
Residential units
352
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R7-2
Lot area
175,488 sq ft
Building area
310,551 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 16, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M00491031-P7.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 81,398 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M00491031-P7
BBL
1016080023
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
112
Proposed dwelling units
112