NYC DOB record · B01362211-I1

5507 16 Avenue

5507 16 Avenue, Brooklyn, NY 11204

Alteration filing in Borough Park, Brooklyn. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Nov 7, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B01362211-I1

5507 16 Avenue

Brooklyn, NY 11204

Alteration filing · status dated Nov 5, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
24
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B01362211-I1 as a alteration filing at 5507 16 Avenue, Brooklyn, NY 11204. Its latest published status category is Approved, dated Nov 5, 2026. The filing records 24 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Nov 5, 2026
Proposed scale
24 proposed dwelling units
The building, not the filingopen housing violations, the owner of record and every filing at BIN 3130664Applicant of recordSee the 449 filings that name Kmb Design Group, LLC
FiledJul 31, 2026
Current recordApproved
Proposed scale24 units
Recorded cost$82,000

What the filing says

A public-record reading of the proposed work.

AT&T - Removal and installation of antenna sectors and related RRH units on roof. Retrofit of cabinets and removal of RRH units on existing platform on roof. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 4-story walk-up apartment building built in 1926, with 33 homes, on a 9,000 sq ft lot.

Built
1926
Last altered
1981
Floors
4
Residential units
33
Building type
Walk-up apartment building
Land use
Mixed residential and commercial
Zoning district
R6
Lot area
9,000 sq ft
Building area
30,057 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 7, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B01362211-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 93,320 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B01362211-I1
BBL
3054890006
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
24
Proposed dwelling units
24