What the filing says
A public-record reading of the proposed work.
Modification of existing Verizon site. Install 3 new antennas, replace 3 antennas, replace 6 RRH units, install new platform with 3 equipment cabinets on the roof.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story elevator apartment building built in 1964, with 61 homes, on a 12,000 sq ft lot.
- Built
- 1964
- Last altered
- 2020
- Floors
- 6
- Residential units
- 61
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R4
- Lot area
- 12,000 sq ft
- Building area
- 54,000 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 19, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 4 open notices on record for this building, out of 24 notices on file; the most recent was issued Sep 14, 2021.
- Construction
Issued Sep 14, 2021 — STOP ALL WORK IMMEDIATELY EXCEPT TO MAKE SITE SAFE/CONTACT BC OFFICE AT 718 802-3677
- Construction
Issued Sep 14, 2021 — STOP ALL WORK IMMEDIATELY, EXCEPT TO MAKE SITE SAFE/CONTACT BC OFFICE AT 718 802-3677
- No report and / or late filing (facade)
Issued Dec 31, 2013 — FAILED TO FILE FISP CYCLE 7C TECHNICAL REPORT BY 02/21/2013
1 further open notice is on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 18, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00778608-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00778608-I1
- BBL
- 3049630044
- Postal code
- 11203 · 1352 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 57
- Proposed dwelling units
- 57








