What the filing says
A public-record reading of the proposed work.
Install medium duty scaffolding as per plans. pipe scaffolding shall comply with chapter 33 of the 2022 NYC building code.
Street Futures classifies this record as a full demolition based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a health facility on a 26,249 sq ft lot.
- Residential units
- 0
- Building type
- Health facility
- Land use
- Public facilities and institutions
- Zoning district
- R6
- Lot area
- 26,249 sq ft
- Building area
- 26,249 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 18, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 8 open notices on record for this building, out of 9 notices on file; the most recent was issued Apr 22, 2025.
- Construction
Issued Apr 22, 2025 — FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. OBSERVED MISSING CRACK GLASS PANELS IN MULTIPLE LOCATION AT MULIPLE LEVEL OF ALL EXPOSURE. DAMAGE WEATHERED WINDOW FRAMES. REMEDY: REPAIR AND OR REPLACE
- Failure to post energy
Issued Dec 1, 2024 — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
- Construction
Issued Oct 30, 2024 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. NOTE: AT TIME OF INSPECTION OBSERVED MISSING/CRACKED GLASS PANELS IN MULTIPLE LOCATIONS ON MULTIPLE FACADE AT ALL EXPOSURES OBSERVED DAMAGED WINDOW FRAMES AT ALL FACADES REMEDY: REPAIR AND/OR REPLACE
5 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 18, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01406166-S4.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 83,050 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01406166-S4
- BBL
- 3046020003
- Postal code
- 11203 · 1448 filings
- Review type
- Professional Certification
- Existing stories
- 5
- Proposed stories
- Empty in the source
- Existing dwelling units
- 0
- Proposed dwelling units
- Empty in the source








