NYC DOB record · M01429511-I1

566 Seventh Avenue

566 Seventh Avenue, Manhattan, NY 10018

Alteration filing in Midtown-Times Square, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed.

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 1, 2026 · Verify the source row

Open full map
566 Seventh Avenue record graphic showing the DOB filing status and stated proposal scale
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01429511-I1 as a alteration filing at 566 Seventh Avenue, Manhattan, NY 10018. Its latest published status category is Approved, dated Aug 24, 2026. The filing records 95 proposed stories.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Aug 24, 2026
Proposed scale
95 proposed stories
Complete building dossierView all 3 filings associated with BIN 1024648Applicant of recordSee the 3 filings that name M.G. Mclaren Engineering And
FiledJul 22, 2026
Current recordApproved
Proposed scale95 stories
Recorded cost$364,000

What the filing says

A public-record reading of the proposed work.

Modification to the supporting structures and sign sizes for two signs specified on plans as Sign A and Sign B. Signs filed separately.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01429511-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

Scope and identifiers

The details used to match this filing.

DOB filing number
M01429511-I1
BBL
1010120032
Review type
Professional Certification
Existing stories
95
Proposed stories
95
Existing dwelling units
0
Proposed dwelling units
0
Structural work