What the filing says
A public-record reading of the proposed work.
Installation of a temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a vacant land on a 1,667 sq ft lot.
- Last altered
- 2023
- Residential units
- 0
- Building type
- Vacant land
- Land use
- Vacant land
- Zoning district
- R6B
- Lot area
- 1,667 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 6 open notices on record for this building, out of 11 notices on file; the most recent was issued Feb 3, 2025.
- Construction
Issued Feb 3, 2025 — BUILDING DEMO'D & BACKFILLED, JOB #322033143,SIGNED OFF 1/30/25. PER BC3306.10, OBTAINED WAIVER FOR FOUNDATION & UNDERPINNING NOTED AS WEAKENED/FAILED.ON APPRVD DRWGS. REMEDY: COMPLY W CODE. PRIOR TO CONS TRUCTION, RETAIN NYS PE TO EVALUATE CONDITIONS, REVIEW HISTORIC INFO/ DRWGS. INCORPORATE INTO CONSTRUCTION DOCUMENTS
- Unsafe
Issued Jul 14, 2020
- Construction
Issued Jul 10, 2020 — STOP ALL WORK IMMEDIATELY AND MAKE THE SITE SAFE, CONTACT THE BOROUGH COMMISSIONER'S OFFICE AT 718 802-3677
3 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00595639-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00595639-I1
- BBL
- Empty in the source
- Postal code
- 11231 · 2803 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 2
- Proposed dwelling units
- 2