What the filing says
A public-record reading of the proposed work.
Foundation filed in conjunction with nb job number x01250398-i1.
Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 1-story store building built in 1923, on a 23,000 sq ft lot.
- Built
- 1923
- Last altered
- 1996
- Floors
- 1
- Residential units
- 0
- Building type
- Store building
- Land use
- Commercial and office
- Zoning district
- R8
- Lot area
- 23,000 sq ft
- Building area
- 21,000 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 20, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 5 open notices on record for this building, out of 13 notices on file; the most recent was issued Jan 22, 2026.
- Construction
Issued Jan 22, 2026 — BC PARTIAL SWO ISSUED UNDER APPLICATION #APPLICATION #X01197441-I1 DUE TO DUE TO SUSPENSION OF THE GENERAL CONTRACTOR'S LICENSE.
- Construction
Issued Jan 22, 2026 — DUE TO THE SUSPENSION OF THE GENERAL CONTRACTOR LICENSE UNDER ALL WORK MUST STOP IMMEDIATELY UNDER JOB# X01197441-S1NEW GENERAL CONTRACTOR MUST BE OBTAINED TO SUPERSEDE WORK AS LICENSE OF RECORD.
- Construction
Issued Jan 22, 2026 — DUE TO THE SUSPENSION OF THE GENERAL CONTRACTOR LICENSE UNDER ALL WORK MUST STOP IMMEDIATELY UNDER JOB# X01197441 NEW GENERAL CONTRACTOR MUST BE OBTAINED TO SUPERSEDE WORK AS LICENSE OF RECORD.
2 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 20, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01250398-S4.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01250398-S4
- BBL
- 2031780001
- Postal code
- 10453 · 146 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- 12
- Existing dwelling units
- Empty in the source
- Proposed dwelling units
- 77








