What the filing says
A public-record reading of the proposed work.
Suspended scaffold in order to perform close-up inspections and facade repairs. No change in use, occupancy or egress under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 7-story elevator apartment building built in 2008, with 61 homes, on a 13,322 sq ft lot.
- Built
- 2008
- Floors
- 7
- Residential units
- 61
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R7B
- Lot area
- 13,322 sq ft
- Building area
- 60,520 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 16, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 6 open notices on record for this building, out of 32 notices on file; the most recent was issued Jul 29, 2025.
- Construction
Issued Jul 29, 2025 — EMERGENCY WORK ORDER DUE TO IMMEDIATELY HAZARDOUS CONDITION EXIST ON B UILDING AS PER PE/RA FISP REPORT ISSUED ON 2/12/2025.TO THIS DAY 7/29/ 25,NO SAFETY MEASURES ARE IN PLACE TO PROTECT THE PUBLIC.REMEDY:TAKE A ND PROVIDE SAFETY MEASURES TO SECURE PUBLIC SAFETY AT EXP1 NORTH ELEV AND EXP3 SOUTH ELEV
- Hazardous condition (facade)
Issued Feb 20, 2025 — CYCLE 9A UNSAFE REPORT FILED
- Fail to certify class
Issued Jan 10, 2024 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
3 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 15, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01434505-I1.
- Current status updated02
The latest recorded filing status is “Objections.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 62,630 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01434505-I1
- BIN
- 1087984
- BBL
- 1017560039
- Postal code
- 10037 · 51 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- Empty in the source
- Proposed dwelling units
- Empty in the source