NYC DOB record · M00704671-I1

59 Henry Street

59 Henry Street, Manhattan, NY 10002

Alteration filing in Chinatown-Two Bridges, Manhattan. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 24, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M00704671-I1

59 Henry Street

Manhattan, NY 10002

Alteration filing · status dated Sep 21, 2026

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
80
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M00704671-I1 as a alteration filing at 59 Henry Street, Manhattan, NY 10002. Its latest published status category is Recorded as completed, dated Sep 21, 2026. The filing records 80 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Sep 21, 2026
Proposed scale
80 proposed dwelling units
The building, not the filingthe owner of record and every filing at BIN 1084612Applicant of recordSee the 1125 filings that name Joel Phagoo P.E. PLLC
FiledJul 12, 2022
Current recordRecorded as completed
Proposed scale80 units
Recorded cost$24,750

What the filing says

A public-record reading of the proposed work.

Installation of heavy duty sidewalk shed during nb const, filed sep. sidewalk shed shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 19-story elevator apartment building built in 2021, with 80 homes, on a 17,000 sq ft lot.

Built
2021
Last altered
2021
Floors
19
Residential units
80
Building type
Elevator apartment building
Land use
Mixed residential and commercial
Zoning district
R7-2
Lot area
17,000 sq ft
Building area
123,578 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 24, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M00704671-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “LOC Issued.”

    03
  4. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    04

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M00704671-I1
BBL
1002800015
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
0
Proposed dwelling units
80
Sidewalk shed