NYC DOB record · B00450729-P1

60 West End Avenue

60 West End Avenue, Brooklyn, NY 11235

Alteration filing in Brighton Beach, Brooklyn. The latest DOB status is filing withdrawn.

The applicant withdrew this filing, so it is not going forward. What every status means

Closed or withdrawnAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 14, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00450729-P1

60 West End Avenue

Brooklyn, NY 11235

Alteration filing · status dated Oct 20, 2023

Current record
Closed or withdrawn
Proposed scale
Not stated
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00450729-P1 as a alteration filing at 60 West End Avenue, Brooklyn, NY 11235. Its latest published status category is Closed or withdrawn, dated Oct 20, 2023. The published record does not state proposed stories or dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Closed or withdrawn
Latest status date
Oct 20, 2023
Proposed scale
Not stated in this filing
The building, not the filingwhat it sold for, apartment sizes, the owner of record and every filing at BIN 3326901Applicant of recordSee the 576 filings that name A&d Engineering, PLLC
FiledAug 8, 2023
Current recordClosed or withdrawn
Proposed scaleNot specified
Recorded cost$6,000

What the filing says

A public-record reading of the proposed work.

Provide new 1" domestic water line to 2 new boilers, connection is located after existing domestic water sub-meter. provide 2-1/2" gas lines to 2 new boiler, connection is located after existing gas meter. connect new 4" floor drain to nearest s. vent li

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 7-story place of worship built in 1951, on a 44,793 sq ft lot.

Built
1951
Floors
7
Residential units
0
Building type
Place of worship
Land use
Public facilities and institutions
Zoning district
R6
Lot area
44,793 sq ft
Building area
116,264 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 21, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 4 open notices on record for this building, out of 26 notices on file; the most recent was issued Jun 5, 2024.

  • Construction

    Issued Jun 5, 2024 — PARTIAL VACATE ORDER DUE TO UNSAFE NOTIFICATION FILED FOR 60 WEST END AVE AS OBSERVED OF CRACKED AND DISPLACED BRICKS AT COURTYARD WEST ELEV ATION AND DETERIORATED BRICKS AS WELL AS UNSECURED HAZARD MATERIALS AT PLAYGROUND AT NORTH ELEV.THESE CONDITIONS HAVE THEREFORE MADE THE ENTI RE COURTYARD AND PLAYGROUND UNABLE TO BE OCCUPIED.REMEDY:VACATE

  • Hazardous condition (facade)

    Issued Jun 2, 2024 — CYCLE 9C UNSAFE REPORT FILED

  • Construction

    Issued May 29, 2024 — EMERGENCY WORK ORDER DUE TO CRACKED,SPALLING AND DETERIORATED BRICK FA CE AND STONE AS DETERIORATED MORTAR JOINTS AT MULTIPLE LOCATIONS AT EX P1 EAST ELEV AND EXP2 SOUTH ELEV AND EXP3 WEST ELEV.REMEDY:PROVIDE ADE QUATE SAFETY MEASURES.REPAIR UNSAFE FACADE AS PER 1RCNY 103.04.FILE AS UNSAFE REPORT

  • 1 further open notice is on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00450729-P1.

    01
  2. Current status updated

    The latest recorded filing status is “Filing Withdrawn.”

    02

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00450729-P1
BBL
3087130077
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
0
Proposed dwelling units
0
plumbing