NYC DOB record · X01458804-I1

601 Pelham Parkway North

601 Pelham Parkway North, Bronx, NY 10467

Alteration filing in Allerton, Bronx. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 1, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · X01458804-I1

601 Pelham Parkway North

Bronx, NY 10467

Alteration filing · status dated Sep 28, 2026

Current record
Approved
Proposed scale
6 stories
Dwelling units
116
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing X01458804-I1 as a alteration filing at 601 Pelham Parkway North, Bronx, NY 10467. Its latest published status category is Approved, dated Sep 28, 2026. The filing records 6 proposed stories and 116 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 28, 2026
Proposed scale
6 proposed stories and 116 proposed dwelling units
Applicant of recordSee the 19 filings that name Ds Engineering Services, PC
FiledSep 25, 2026
Current recordApproved
Proposed scale6 stories
Recorded cost$153,000

What the filing says

A public-record reading of the proposed work.

Exterior masonry wall repairs.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 7-story elevator apartment building built in 1937, with 116 homes, on a 24,375 sq ft lot.

Built
1937
Floors
7
Residential units
116
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R7-1
Lot area
24,375 sq ft
Building area
108,757 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 11, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 4 open notices on record for this building, out of 39 notices on file; the most recent was issued Mar 8, 2024.

  • Construction

    Issued Mar 8, 2024 — EMERGENCY WORK ORDER.BLDG SFFRD A FIRE ON 3/4/24.ROOF OPEN OVER "12" LINE.STRCTRL DAMAGE TO FLRS@APARTMENTS 512 & 612.FIRE,WATER,&SMOKE DAMAGE THROUGHOUT.COMPLY WITH COMMISSIONER'S ORDER:DOB VIOLATION #030524FEU21101AK (CONTROL #343467)IMMEDIATELY

  • Construction

    Issued Mar 5, 2024 — FTM.BLDG SFFRD A FIRE ON 3/4/24.ROOF OPEN OVER "12"LINES STRCTRL DAMAGE TO FLOORS@APARTMENTS 512&612.FIRE,WATER,SMOKE DAMAGE THROUGHOUT OWNR TO ENGAGE NYSPE&ENDRSD CONCTRACTOR TO EVAL THE ENTIRE BLDG&REPAIR UNDR PRMT.OBTAIN PRMT TO RPAIR BY 3/26/24

  • Construction

    Issued Mar 5, 2024 — EMERGENCY WORK ORDER.BLDG SFFRD A FIRE ON 3/4/24.ROOF OPEN OVER "12" LINE.STRCTRL DAMAGE TO FLRS@APARTMENTS 512&612.FIRE,WATER,&SMOKE DAMAGE THROUGHOUT.COMPLY WITH COMMISSIONER'S ORDER:DOB VIOLATION #030524FEU21101AK (CONTROL #343467)IMMEDIATELY

  • 1 further open notice is on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 11, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing X01458804-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 95,944 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
X01458804-I1
BIN
2049724
BBL
2043370001
Review type
Professional Certification
Existing stories
6
Proposed stories
6
Existing dwelling units
116
Proposed dwelling units
116
General construction