What the filing says
A public-record reading of the proposed work.
Temp standpipe in support of make-safe operations.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 5-story educational building built in 1906, on a 27,681 sq ft lot.
- Built
- 1906
- Floors
- 5
- Residential units
- 0
- Building type
- Educational building
- Land use
- Public facilities and institutions
- Zoning district
- R8B
- Lot area
- 27,681 sq ft
- Building area
- 93,420 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 2, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 76 open notices on record for this building, out of 91 notices on file; the most recent was issued Feb 18, 2026.
- Construction
Issued Feb 18, 2026 — BOROUGH COMMISSIONER STOP WORK ORDER APPLICATION #121167236DUE TO APPLICANT WITHDRAWAL.
- Construction
Issued Feb 5, 2026 — DOB HEARS YOU TO STOP ALL WORK UNDER JOB # 120077530
- Construction
Issued Jan 28, 2026 — FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. OBSERVED DAMAGED DEFECTIVE CORNICE IN MULTIPLE LOCATIONS ON ALL EXPOSURE. ALSO DAMAGED MORTAR JOINTS IN MULTIPLE LOCATIONS ON ALL EXPOSURES. REMEDY: REPAIR AND OR REPLACE
73 further open notices are on file. Open the source dataset for the full list.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01337575-S3.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01337575-S3
- BIN
- 1079685
- BBL
- 1003920010
- Postal code
- 10009 · 100 filings
- Review type
- Standard Plan Examination
- Existing stories
- 5
- Proposed stories
- 5
- Existing dwelling units
- 0
- Proposed dwelling units
- 0








