What the filing says
A public-record reading of the proposed work.
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 5-story educational building built in 1906, on a 27,681 sq ft lot.
- Built
- 1906
- Floors
- 5
- Residential units
- 0
- Building type
- Educational building
- Land use
- Public facilities and institutions
- Zoning district
- R8B
- Lot area
- 27,681 sq ft
- Building area
- 93,420 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 18, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 76 open notices on record for this building, out of 91 notices on file; the most recent was issued Feb 18, 2026.
- Construction
Issued Feb 18, 2026 — BOROUGH COMMISSIONER STOP WORK ORDER APPLICATION #121167236DUE TO APPLICANT WITHDRAWAL.
- Construction
Issued Feb 5, 2026 — DOB HEARS YOU TO STOP ALL WORK UNDER JOB # 120077530
- Construction
Issued Jan 28, 2026 — FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. OBSERVED DAMAGED DEFECTIVE CORNICE IN MULTIPLE LOCATIONS ON ALL EXPOSURE. ALSO DAMAGED MORTAR JOINTS IN MULTIPLE LOCATIONS ON ALL EXPOSURES. REMEDY: REPAIR AND OR REPLACE
73 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 18, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01396160-P2.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 83,050 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01396160-P2
- BBL
- 1003920010
- Postal code
- 10009 · 280 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 0
- Proposed dwelling units
- 0








