What the filing says
A public-record reading of the proposed work.
Vc sp: sprinkler modifications within the existing vanderbilt clinic as indicated on plans filed herewith. no change to use, egress or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 22-story health facility built in 1930, on a 364,433 sq ft lot.
- Built
- 1930
- Last altered
- 2024
- Floors
- 22
- Residential units
- 0
- Building type
- Health facility
- Land use
- Public facilities and institutions
- Zoning district
- R8
- Lot area
- 364,433 sq ft
- Building area
- 3,533,539 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 25, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 38 open notices on record for this building, out of 133 notices on file; the most recent was issued May 26, 2022.
- Plumbing
Issued May 26, 2022 — FAILURE TO PROVIDE APPROVED / ACCEPTED PLANS AT JOB SITE AT TIME OF INSPECTION I OBSERVED AT TIME OF SPOT CHECK INSPECTION FOR WASTE, WATER VENT AND SEWER ROUGHING FOR ALL FLOORS NO PLANS ON SITE JOB NUMBER M00709960I1PL
- No report and / or late filing (facade)
Issued Jan 31, 2019 — FAILED TO FILE FISP CYCLE 8B TECHNICAL REPORT BY 02/21/2018
- Elevator annual inspection /
Issued Dec 1, 2016 — VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2015 INSPECTION/TEST
35 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 25, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01006595-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 70,325 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01006595-I1
- BBL
- 1021380040
- Postal code
- 10032 · 135 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 0
- Proposed dwelling units
- 0








