NYC DOB record · M01238897-I1

622 Third Avenue

622 Third Avenue, Manhattan, NY 10017

Alteration filing in Murray Hill-Kips Bay, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Nov 6, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01238897-I1

622 Third Avenue

Manhattan, NY 10017

Alteration filing · status dated Nov 4, 2026

Current record
Approved
Proposed scale
38 stories
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01238897-I1 as a alteration filing at 622 Third Avenue, Manhattan, NY 10017. Its latest published status category is Approved, dated Nov 4, 2026. The filing records 38 proposed stories.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Nov 4, 2026
Proposed scale
38 proposed stories
The building, not the filingopen housing violations, the owner of record and every filing at BIN 1089024Applicant of recordSee the 25 filings that name Azarkian Architecture P.C.
FiledJan 8, 2026
Current recordApproved
Proposed scale38 stories
Recorded cost$867,930

What the filing says

A public-record reading of the proposed work.

Interior renovation of exisitng UG6 Easting and drinking establishment as per plan. Removal of interior finishes and, interior construction and new door on storefront as per plan. No change to use, egress or occupancy under this application.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 41-story office building built in 1974, on a 46,148 sq ft lot.

Built
1974
Last altered
2013
Floors
41
Residential units
0
Building type
Office building
Land use
Commercial and office
Zoning district
C5-2.5
Lot area
46,148 sq ft
Building area
986,431 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 6, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01238897-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 92,577 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01238897-I1
BBL
1012950033
Review type
Standard Plan Examination
Existing stories
38
Proposed stories
38
Existing dwelling units
0
Proposed dwelling units
0
General construction