What the filing says
A public-record reading of the proposed work.
Installation of non load bearing partitions as per plans filed herewith.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 41-story office building built in 1974, on a 46,148 sq ft lot.
- Built
- 1974
- Last altered
- 2013
- Floors
- 41
- Residential units
- 0
- Building type
- Office building
- Land use
- Commercial and office
- Zoning district
- C5-2.5
- Lot area
- 46,148 sq ft
- Building area
- 986,431 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 3, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 49 open notices on record for this building, out of 277 notices on file; the most recent was issued Jun 10, 2023.
- Construction
Issued Jun 10, 2023 — STRUCTURAL RENDERED NON-COMPLIANT DUE TO FIRE THAT OCCURRED AT 369 LEXINGTON AVENUE WATER TOWER, THAT CAUSED DAMAGE TO GLASS AT 5,6,7 FLOOR AND FA ADE ON 5TH TO 7TH FLOOR.
- No report and / or late filing (facade)
Issued Feb 22, 2022 — FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
- Non-residential elevator periodic
Issued Dec 17, 2021 — FAILURE TO PERFORM CATEGORY 5 INSPECTION
46 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 23, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01354197-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 74,561 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01354197-I1
- BBL
- 1012950033
- Postal code
- 10017 · 698 filings
- Review type
- Standard Plan Examination
- Existing stories
- 38
- Proposed stories
- 38
- Existing dwelling units
- 0
- Proposed dwelling units
- 0








