What the filing says
A public-record reading of the proposed work.
Replace existing air outlets, install new branch supply and return ductwork, and add a new VAV air terminal box.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 22-story health facility built in 1930, on a 364,433 sq ft lot.
- Built
- 1930
- Last altered
- 2024
- Floors
- 22
- Residential units
- 0
- Building type
- Health facility
- Land use
- Public facilities and institutions
- Zoning district
- R8
- Lot area
- 364,433 sq ft
- Building area
- 3,533,539 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 20, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 2 notices on file; the most recent was issued Nov 1, 2023.
- Failure to correct swarmp conditions (facade)
Issued Nov 1, 2023 — FAILURE TO CORRECT SWARMP CONDITIONS
- Plumbing
Issued Dec 19, 2022 — FAILURE TO PROVIDE APPROVED / ACCEPTED PLANS AT JOB SITE AT TIME OF INSPECTION I OBSERVED NO PLANS ON SITE AT TIME OF SPOT CHECK INSPECTION FOR EIGHTH FLOOR FOR SPRINKLER FINISH FOR JOB NUMBER M99527306
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 20, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01309261-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01309261-I1
- BBL
- 1021380040
- Postal code
- 10032 · 113 filings
- Review type
- Standard Plan Examination
- Existing stories
- 24
- Proposed stories
- 24
- Existing dwelling units
- 0
- Proposed dwelling units
- 0