What the filing says
A public-record reading of the proposed work.
Interior rehab on the 1st floor of existing com store on the East 61st Street, to create a lobby which connects with the building core. All other work types are to be filed under separate Alt II, No change of use, egress, occupancy is involved.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 22-story condominium built in 1958, on a 27,690 sq ft lot.
- Built
- 1958
- Last altered
- 1993
- Floors
- 22
- Residential units
- 0
- Building type
- Condominium
- Land use
- Commercial and office
- Zoning district
- C5-3
- Lot area
- 27,690 sq ft
- Building area
- 465,364 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 12, 2026. They describe the tax lot, not this filing.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01486528-I1.
- Current status updated02
The latest recorded filing status is “Pending CPE/ACPE Assignment.”
For scale: half of DOB filings are permitted within 23 days of being filed and a quarter take longer than 4 months, measured across 99,111 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01486528-I1
- BBL
- 1013757502
- Postal code
- 10065 · 928 filings
- Review type
- Standard Plan Examination
- Existing stories
- 22
- Proposed stories
- 22
- Existing dwelling units
- 0
- Proposed dwelling units
- 0








