NYC DOB record · M01010700-I1

665 5 Avenue

665 5 Avenue, Manhattan, NY 10022

Alteration filing in Midtown-Times Square, Manhattan. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Nov 12, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01010700-I1

665 5 Avenue

Manhattan, NY 10022

Alteration filing · status dated Nov 9, 2026

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01010700-I1 as a alteration filing at 665 5 Avenue, Manhattan, NY 10022. Its latest published status category is Recorded as completed, dated Nov 9, 2026. The published record does not state proposed stories or dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Nov 9, 2026
Proposed scale
Not stated in this filing
The building, not the filingopen housing violations, the owner of record and every filing at BIN 1035721Applicant of recordSee the 201 filings that name Brand Access Solutions
FiledFeb 28, 2024
Current recordRecorded as completed
Proposed scaleNot specified
Recorded cost$20,000

What the filing says

A public-record reading of the proposed work.

Equipment use: dual personnel/material hoists. car # 1 shall be 11000# & car # 2 shall be 7500# capacity. hoists shall comply with ch #33 of the NYC bc. no change in use, occ or egress under this app. elev app sub sep.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 28-story office building built in 2024, on a 11,050 sq ft lot.

Built
2024
Last altered
2023
Floors
28
Residential units
0
Building type
Office building
Land use
Commercial and office
Zoning district
C5-3
Lot area
11,050 sq ft
Building area
168,537 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 12, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01010700-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “LOC Issued.”

    03
  4. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    04

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 97,160 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01010700-I1
BBL
1012880069
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
0
Proposed dwelling units
0