What the filing says
A public-record reading of the proposed work.
Installation of temporary chute filed in conjunction with interior demo # b00631022
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story elevator apartment building built in 1960, with 117 homes, on a 23,320 sq ft lot.
- Built
- 1960
- Floors
- 6
- Residential units
- 117
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R6
- Lot area
- 23,320 sq ft
- Building area
- 92,934 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 18, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 14 open notices on record for this building, out of 63 notices on file; the most recent was issued Sep 16, 2026.
- Construction
Issued Sep 16, 2026 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED THE FOLLOWING CONDITIONS. MULTIPLE CRACKS/STEP CRACKS, MISSING BRICKS DAMAGED AND SPALLING BRICKS. REMEDY: REPAIR AND/OR REPLACE
- Construction
Issued Apr 22, 2025 — FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. OBSERVED VACANT BLDG @ EXP@1,2,3,4 OBSERVED MULTIPLE STEP CRACKS & VERTICAL CRACKS OBSERVED DAMAGED WINDOW FRAME/NO WINDOWS FRAMES OBSERVED ALL WINDOW SECURE/CLOSED OBSERVED @ EXP#3 DAMAGED/REMOVED PARAPET. REMEDY: REPAIR AND/OR REPLACE
- Construction
Issued Oct 23, 2024 — EMERGENCY WORK ORDER DUE TO HAZAROUS CONDITIONS AT EXPOSURE #4 OBSERVED BROKEN WINDOW WITH SHARDS STILL EXPOSED TO PUBLIC AT GROUND LEVEL UNDER THE SHED. REMEDY: IMMEDIATELY REPAIR DAMAGED/BROKEN WINDOW REMOVE ALL LOOSE MATERIAL UNDER LICENSED PROFESSIONAL
11 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 18, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01474538-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 83,050 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01474538-I1
- BBL
- 3048200001
- Postal code
- 11203 · 1448 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 0
- Proposed dwelling units
- 0