What the filing says
A public-record reading of the proposed work.
Interior demolition and construction in the basement and 1st - 6th floors. no change to egress, use or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story elevator apartment building built in 1960, with 117 homes, on a 23,320 sq ft lot.
- Built
- 1960
- Floors
- 6
- Residential units
- 117
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R6
- Lot area
- 23,320 sq ft
- Building area
- 92,934 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 17, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 13 open notices on record for this building, out of 62 notices on file; the most recent was issued Apr 22, 2025.
- Construction
Issued Apr 22, 2025 — FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. OBSERVED VACANT BLDG @ EXP@1,2,3,4 OBSERVED MULTIPLE STEP CRACKS & VERTICAL CRACKS OBSERVED DAMAGED WINDOW FRAME/NO WINDOWS FRAMES OBSERVED ALL WINDOW SECURE/CLOSED OBSERVED @ EXP#3 DAMAGED/REMOVED PARAPET. REMEDY: REPAIR AND/OR REPLACE
- Construction
Issued Oct 23, 2024 — FTM BLDG IN CODE COMPLIANT MANNER. OBSERVED VACANT BLDG WILL MULTIPLE ENTRANCE OPEN AT FACADE EXP 1,2,3,4 OBSERVED STEP CRACKS AND VERTICAL CRACK OBSERVED MULTIPLE WINDOW OPEN WITH BROKEN PLATIC OBSERVED DAMAGE MORTAR JOINTS & DAMAGE WINDOWSILLS THROUGHOUT THE FACADE BROKEN WINDOW @ EXP 4. REMEDY: REPAIR AND OR REPLACE
- Construction
Issued Oct 23, 2024 — EMERGENCY WORK ORDER DUE TO HAZAROUS CONDITIONS AT EXPOSURE #4 OBSERVED BROKEN WINDOW WITH SHARDS STILL EXPOSED TO PUBLIC AT GROUND LEVEL UNDER THE SHED. REMEDY: IMMEDIATELY REPAIR DAMAGED/BROKEN WINDOW REMOVE ALL LOOSE MATERIAL UNDER LICENSED PROFESSIONAL
10 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 17, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00631022-I1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00631022-I1
- BBL
- 3048200001
- Postal code
- 11203 · 1352 filings
- Review type
- Standard Plan Examination
- Existing stories
- 6
- Proposed stories
- 6
- Existing dwelling units
- 108
- Proposed dwelling units
- 108








