What the filing says
A public-record reading of the proposed work.
Installation of temporary construction fence per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story condominium built in 1931, with 54 homes, on a 12,020 sq ft lot.
- Built
- 1931
- Floors
- 6
- Residential units
- 54
- Building type
- Condominium
- Land use
- Elevator apartments
- Zoning district
- R7A
- Lot area
- 12,020 sq ft
- Building area
- 46,997 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 21, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 10 open notices on record for this building, out of 27 notices on file; the most recent was issued Sep 10, 2026.
- Construction
Issued Sep 10, 2026 — EWO DUE TO DISPLACED,LEANING/HANGING PARAPET PANEL ON SIDEWALK SHED @ EXP1 (NORTH ELEV) NEAR ENTRANCE OF BUILDING. ALSO DAMAGED MUDSILLS @ MULTIPLE LOCAITONS.REMEDY/REQUIREMENTS: IMMEDIAELY FIX PARAPET PANEL & CLOSE GAP IN SHED LEANING @ EXP1 AND MUDSILLS SHOULD BE CHANGED UNDER DIRECTION OF A LICENSED PROFESSIONAL
- Construction
Issued Sep 10, 2026 — FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.NOTED AT THE T IME OF INSPECTION,I OBSERVED NO ROOF ON BUILDING,MISSING/DAMAGED WINDO WS,CRACKED/STEP CRACK ON MASONRY AND STUCCO,DAMAGED MORTAR JOINTS AND SPALLING STUCCO ON ALL EXPOSURES IN MULTIPLE LOCATIONS.REMEDY:REPAIR A ND/OR REPLACE
- Construction
Issued Apr 17, 2025 — FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.OBSERVED NO RO OF ON BUILDING,MISSING/BROKEN WINDOWS,LARGE CRACKS IN MASONRY,DAMAGED MORTAR JOINTS ON ALL EXPOSURES IN MULTIPLE LOCATIONS.REMEDY:REPAIR AND /OR REPLACE
7 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00152047-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00152047-I1
- BBL
- 3007417501
- Postal code
- 11220 · 3015 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- Empty in the source
- Proposed dwelling units
- Empty in the source








