What the filing says
A public-record reading of the proposed work.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. live load 300psf.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story elevator apartment building built in 1928, with 49 homes, on a 9,700 sq ft lot.
- Built
- 1928
- Floors
- 6
- Residential units
- 49
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R6
- Lot area
- 9,700 sq ft
- Building area
- 46,550 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 25, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 15 open notices on record for this building, out of 63 notices on file; the most recent was issued May 6, 2024.
- Construction
Issued May 6, 2024 — PARTIAL VACATE ORDER DUE TO THE MULTIPLE HAZARDOUS CONDITIONS SUCH AS CRACKED AND SPALLING MASONRY BRICKS,CRACKED AND DETERIORATED WINDOW SI LLS AND LINTELS.THESE CONDITIONS HAVE THEREFORE MADE THE COURTYARDS AT EXP2 SOUTH,3 WEST,AND 4 NORTH UNABLE TO BE OCCUPIED.REMEDY:VACATE ENTI RE COURTYARD AT EXP2 SOUTH,3 WEST,AND 4 NORTH.USED IN EMERGENCY ONLY
- Construction
Issued May 1, 2024 — EMERGENCY WORK ORDER DUE TO DEFECTIVE FACADE.LARGE HORIZONTAL CRACKED BRICK MASONRY AND MORTAR AND BULGING AT PARAPET OF EXP1 EAST ROOF LEVE L.DEBOUNDED STONE ORNAMENTALS AT 6TH STORY WINDOWS OF EXP1.REMEDY:IMME DIATELY PROVIDE SAFETY MEASURES AND INSTALL SIDEWALK SHED AT EXP1 EAST BRYANT AVENUE
- Construction
Issued Nov 13, 2023 — REAR YARD RETAINING WALL INSTATE OF DISREPAIR CONDITIONS WITH CRACKS, SECTION MISSING, DETERIORATED AND FALLING A PARTS. ALSO ENTIRE RETAINING WALL STRUCTURALLY COMPROMISED. SUBMIT AN ENGINEER'S REPORT ON RETAINING WALL STRUCTURAL STABILITY.
12 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 25, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01045320-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 74,561 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01045320-I1
- BIN
- 2006556
- BBL
- 2027630233
- Postal code
- 10474 · 66 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 49
- Proposed dwelling units
- 49