What the filing says
A public-record reading of the proposed work.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the NYC building code. no change in use, occupancy, or egress under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 3-story walk-up apartment building built in 1899, with 4 homes, on a 2,500 sq ft lot.
- Built
- 1899
- Floors
- 3
- Residential units
- 4
- Building type
- Walk-up apartment building
- Land use
- Walk-up apartments
- Zoning district
- R7-1
- Lot area
- 2,500 sq ft
- Building area
- 2,974 sq ft
- Historic district
- Longwood Historic District
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 24, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 39 open notices on record for this building, out of 39 notices on file; the most recent was issued Jan 9, 2026.
- Construction
Issued Jan 9, 2026 — FTC W/COMMISSIONER'S ORDER CONTROL#347856 VIO#091525PI20202SB DATED 09/15/25 REQUIRING OWNER TO PROVIDE A CORRECTIVE ACTION PLAN BY 10/15/25&START BLDG REPRS UNDER PERMIT BY 11/15/25&COMPL/SIGN OFF WORK BY 12/15/25. A REVISED CAP WAS NOT RESUBMITTED FOLLOWING DOB'S REJECT IMMED COMPLY W/COMMISSIONER'S ORDER#347856 VIO#091525PI20202SB
- Construction
Issued Sep 15, 2025 — CORRECTIVE ACTION PLAN REQ'D-OBSVD @ EXP1 DAMAGED/DETERIORATING CORNICE & SEVERAL CRACKS @ DECORATIVE MASONRY ABOVE 1FL WINDOWS @ EXP4 OBSVD SEVERLY LOOSE CORNICE&SPALLING OF BRICKS&STUCCO @ CHIMNEY.OWNER TO IMMED RETAIN REG DESIGN PROF IN GOOD STANDING W/DOB&NYS TO EVAL ENTIRE BLDG & SUBMIT CORRECTIVE ACTION PLAN BY 10/15/2025
- Landmark
Issued Feb 10, 2017
36 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 24, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01357974-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 86,497 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01357974-I1
- BIN
- 2005558
- BBL
- 2027080030
- Postal code
- 10455 · 269 filings
- Review type
- Professional Certification
- Existing stories
- 3
- Proposed stories
- 3
- Existing dwelling units
- 4
- Proposed dwelling units
- 4








