What the filing says
A public-record reading of the proposed work.
Installation of 300psf sidewalk shed and pipe scaffold as per plans. all equipment shall comply with chapter # 33 of the code 2014, no changes to use, egress and occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 8-story elevator apartment building built in 2021, with 205 homes, on a 40,050 sq ft lot.
- Built
- 2021
- Last altered
- 2021
- Floors
- 8
- Residential units
- 205
- Building type
- Elevator apartment building
- Land use
- Mixed residential and commercial
- Zoning district
- R6B
- Lot area
- 40,050 sq ft
- Building area
- 175,042 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 4 open notices on record for this building, out of 58 notices on file; the most recent was issued Jan 13, 1997.
- Local law 10/81 -
Issued Jan 13, 1997
- Local law 62/91 - boilers
Issued Aug 16, 1993
- Local law 62/91 - boilers
Issued Aug 16, 1993
1 further open notice is on file. Open the source dataset for the full list.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00501363-P5.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00501363-P5
- BBL
- 3015920001
- Postal code
- 11206 · 2249 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 2
- Proposed dwelling units
- 2








