NYC DOB record · M01379610-I1

75 Wall Street

75 Wall Street, Manhattan, NY 10005

Alteration filing in Financial District-Battery Park City, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 9, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01379610-I1

75 Wall Street

Manhattan, NY 10005

Alteration filing · status dated Oct 6, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
253
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01379610-I1 as a alteration filing at 75 Wall Street, Manhattan, NY 10005. Its latest published status category is Approved, dated Oct 6, 2026. The filing records 253 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Oct 6, 2026
Proposed scale
253 proposed dwelling units
The building, not the filingopen housing violations, what it sold for, apartment sizes and every filing at BIN 1085950Applicant of recordSee the 135 filings that name Rlm Engineering PLLC
FiledMay 5, 2026
Current recordApproved
Proposed scale253 units
Recorded cost$1M

What the filing says

A public-record reading of the proposed work.

Replacement of existing water cooled centrifugal chillers on the 2nd floor with new with related piping and ductwork as per plans filed herewith.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 36-story condominium built in 1987, with 346 homes, on a 30,794 sq ft lot.

Built
1987
Last altered
2008
Floors
36
Residential units
346
Building type
Condominium
Land use
Mixed residential and commercial
Zoning district
C5-5
Lot area
30,794 sq ft
Building area
542,494 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 10, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 6 open notices on record for this building, out of 235 notices on file; the most recent was issued Feb 19, 2024.

  • Construction

    Issued Feb 19, 2024 — ENGINEER'S REPORT REQUIRED WITHIN 10 DAYS FOR CONDITIONS NOTED IN SUMMONS #39106279P.

  • Construction

    Issued Feb 19, 2024 — ENGINNERS REPORT REQUIRE WITHIN 10 DAYS FOR CONDITIONS NOTED IN SUMMON S # 35667708Z

  • Construction

    Issued Dec 21, 2023 — FAILURE TO MAINTAIN STRUCTURE AT TIME OF INSPECTION OBSERVED RUSTED STRUCTURAL COLUMNS AT SUBCELLAR OD PARKING GARAGE. REMEDY: OWNER TO HIRE NYSPE TO SUBMIT REPORT TO ERT INSPECTIONS.NYC.GOV WITHIN 14 DAYS ADDRESSING ALL CONDITIONS WITH PLANS , PHOTOS RECOMENDING TIME FRAME AND REPAIRS TO BE COMPLETED

  • 3 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 10, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01379610-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 78,679 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01379610-I1
BBL
1000317501
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
253
Proposed dwelling units
253