NYC DOB record · B00428239-I1

7502 18 Avenue

7502 18 Avenue, Brooklyn, NY 11214

Alteration filing in Bensonhurst, Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 14, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00428239-I1

7502 18 Avenue

Brooklyn, NY 11214

Alteration filing · status dated Apr 22, 2021

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
10
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00428239-I1 as a alteration filing at 7502 18 Avenue, Brooklyn, NY 11214. Its latest published status category is Recorded as completed, dated Apr 22, 2021. The filing records 10 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Apr 22, 2021
Proposed scale
10 proposed dwelling units
Applicant of recordSee the 1374 filings that name Syed Engineering, P.C.
FiledNov 14, 2020
Current recordRecorded as completed
Proposed scale10 units
Recorded cost$8,000

What the filing says

A public-record reading of the proposed work.

Proposed installation of heavy duty sidewalk shed for remedial repairs as per plans. no change in use occupancy or egress under this application. live load 300 per square feet. sidewalk shed shall comply with chapter # 33 of the 2014 code.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 4-story walk-up apartment building built in 1930, with 10 homes, on a 2,160 sq ft lot.

Built
1930
Floors
4
Residential units
10
Building type
Walk-up apartment building
Land use
Mixed residential and commercial
Zoning district
R5
Lot area
2,160 sq ft
Building area
7,776 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 7 open notices on record for this building, out of 8 notices on file; the most recent was issued Aug 24, 2025.

  • Construction

    Issued Aug 24, 2025 — REQUESTING ENGINEERING REPORT DUE TO FIRE. AT THE THE TIME OF INSPECTION OBSERVED EXTENSIVE FIRE,WATER AND SMOKE DAMAGE TO FIRST FLOOR COMMERCIAL SPACE, OBSERVED BADLY CHARRED FLOOR JOIST AT SECOND FLOOR LEVEL POTENTIALLY AFFECTING THE STRUCTURAL STABILITY OF THE STRUCTURE.

  • Construction

    Issued Aug 24, 2025 — STRUCTURE RENDERED NON-COMPLIANT DUE TO FIRE. AT THE TIME OF INSPECTION OBSERVED AT FIRST FLOOR COMMERCIAL SPACE EXTENSIVE FIRE, WATER AND SMOKE DAMAGE. ALSO OBSERVED BADLY CHARRED FLOOR JOIST IN COMMERCIAL SPACE. APARTMENTS ON THE A&B LINE ON THE 2ND & 3RD FLOOR HAS EXTENSIVE FIRE DAMAGE, MISSING FIRE RATING AND MISSING WINDOWS.

  • Construction

    Issued Oct 14, 2006

  • 4 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00428239-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “LOC Issued.”

    03
  4. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    04

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00428239-I1
BIN
3160239
BBL
3062260040
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
10
Proposed dwelling units
10
Sidewalk shed