NYC DOB record · B00340502-I1

76 Congress Street

76 Congress Street, Brooklyn, NY 11201

Alteration filing in Carroll Gardens-Cobble Hill-Gowanus-Red Hook, Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 21, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00340502-I1

76 Congress Street

Brooklyn, NY 11201

Alteration filing · status dated Mar 11, 2026

Current record
Recorded as completed
Proposed scale
7 stories
Dwelling units
10
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00340502-I1 as a alteration filing at 76 Congress Street, Brooklyn, NY 11201. Its latest published status category is Recorded as completed, dated Mar 11, 2026. The filing records 7 proposed stories and 10 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Mar 11, 2026
Proposed scale
7 proposed stories and 10 proposed dwelling units
The building, not the filingwhat it sold for and every filing at BIN 3335987Applicant of recordSee the 75 filings that name Lmw Engineering Group LLC
FiledJun 17, 2021
Current recordRecorded as completed
Proposed scale7 stories
Recorded cost$1,000

What the filing says

A public-record reading of the proposed work.

Structural work for a new seven (7) story building in conjunction with new building application #322040732

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

Violation record

Are there open violations here?

No open violations are recorded for this building.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00340502-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 70,325 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00340502-I1
BBL
3002990011
Review type
Standard Plan Examination
Existing stories
7
Proposed stories
7
Existing dwelling units
10
Proposed dwelling units
10
Structural work