What the filing says
A public-record reading of the proposed work.
Installation of swing stage scaffolding as per plan and in accordance with Chapter 33 of NYC Building Code. No change in use, egress, or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 8-story condominium built in 2009, with 27 homes, on a 11,670 sq ft lot.
- Built
- 2009
- Floors
- 8
- Residential units
- 27
- Building type
- Condominium
- Land use
- Mixed residential and commercial
- Zoning district
- C6-3A
- Lot area
- 11,670 sq ft
- Building area
- 59,814 sq ft
- Historic district
- Tribeca South Historic District
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 13, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 36 notices on file; the most recent was issued Sep 3, 2025.
- Construction
Issued Sep 3, 2025 — CONDITIONS OBSERVED 09/02/2025 BY INSPECTOR WITH BADGE 3718. THE FACADE AT 79 READE STREET, EXPOSURE 2 (LEFT) COURTYARD NEAR ROOF LEVEL ON THE RIGHT HAS SPALLING MASONRY AND CRACKS. SECTIONS OF THE STUCCO HAS FELL TO THE REAR PATIO OF UNIT (2F) AT 77 READE STREET. THE PATIO AT 77 READE STREET IS UNSAFE TO USE OR OCCUPY BASED ON THE DEFECTS
- Construction
Issued Aug 30, 1993
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 13, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01483696-I1.
- Current status updated02
The latest recorded filing status is “Pending Prof Cert QA Assignment.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 95,944 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01483696-I1
- BIN
- 1001629
- BBL
- 1001497501
- Postal code
- 10007 · 284 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- Empty in the source
- Proposed dwelling units
- Empty in the source