NYC DOB record · B00563485-I1

778 East Tenth Street

778 East Tenth Street, Brooklyn, NY 11230

Alteration filing in Flatbush (West)-Ditmas Park-Parkville, Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 14, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00563485-I1

778 East Tenth Street

Brooklyn, NY 11230

Alteration filing · status dated Nov 9, 2021

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
38
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00563485-I1 as a alteration filing at 778 East Tenth Street, Brooklyn, NY 11230. Its latest published status category is Recorded as completed, dated Nov 9, 2021. The filing records 38 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Nov 9, 2021
Proposed scale
38 proposed dwelling units
The building, not the filingwhat it sold for, apartment sizes, the owner of record and every filing at BIN 3170201Applicant of recordSee the 1372 filings that name Syed Engineering, P.C.
FiledJul 26, 2021
Current recordRecorded as completed
Proposed scale38 units
Recorded cost$9,000

What the filing says

A public-record reading of the proposed work.

Proposed installation of heavy duty sidewalk shed as per plans. live load 300 per square feet. sidewalk shed shall comply with chapter # 33 of the 2014 code. no change in use occupancy or egress under this application.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 4-story walk-up apartment building built in 1926, with 38 homes, on a 10,000 sq ft lot.

Built
1926
Floors
4
Residential units
38
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
R7A
Lot area
10,000 sq ft
Building area
28,800 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 21, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00563485-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “LOC Issued.”

    03
  4. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    04

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00563485-I1
BBL
3064970038
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
38
Proposed dwelling units
38
Sidewalk shed