NYC DOB record · B00293181-I1

78 Bartlett Street

78 Bartlett Street, Brooklyn, NY 11206

Alteration filing in South Williamsburg, Brooklyn. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 21, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00293181-I1

78 Bartlett Street

Brooklyn, NY 11206

Alteration filing · status dated Feb 4, 2026

Current record
Approved
Proposed scale
4 stories
Dwelling units
3
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00293181-I1 as a alteration filing at 78 Bartlett Street, Brooklyn, NY 11206. Its latest published status category is Approved, dated Feb 4, 2026. The filing records 4 proposed stories and 3 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Feb 4, 2026
Proposed scale
4 proposed stories and 3 proposed dwelling units
The building, not the filingEvery filing at BIN 3061471, with the parcel and violation recordApplicant of recordSee the 439 filings that name Structural Engineering Technologies
FiledJan 22, 2020
Current recordApproved
Proposed scale4 stories
Recorded cost$50,000

What the filing says

A public-record reading of the proposed work.

Structural plans hereby filed in conjunction with alt 1 job# 321597991

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 4-story walk-up apartment building built in 2022, with 3 homes, on a 2,500 sq ft lot.

Built
2022
Last altered
2022
Floors
4
Residential units
3
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
R6
Lot area
2,500 sq ft
Building area
6,285 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 21, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 3 open notices on record for this building, out of 13 notices on file; the most recent was issued Jun 27, 2023.

  • Construction

    Issued Jun 27, 2023 — DUE TO WITHDRAWAL OF CONTRACTOR, BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDER APPLICATION # 321590202 ON 6/27/2023 UNTIL A NEW PERMIT HOLDER IS IN PLACE AS PER ARTICLE 116 OF CHAPTER 1 OF TITLE 28 OF THE AC.

  • Construction

    Issued Jun 27, 2023 — DUE TO WITHDRAWAL OF CONTRACTOR, BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDER APPLICATION # 321590202 ON 6/27/2023 UNTIL A NEW PERMIT HOLDER IS IN PLACE AS PER ARTICLE 116 OF CHAPTER 1 OF TITLE 28 OF THE AC.

  • Fail to certify class

    Issued Jul 21, 2021 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00293181-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 70,325 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00293181-I1
BBL
3022730002
Review type
Standard Plan Examination
Existing stories
4
Proposed stories
4
Existing dwelling units
0
Proposed dwelling units
3
Structural work