NYC DOB record · B00257277-I1

784 Eastern Parkway

784 Eastern Parkway, Brooklyn, NY 11213

Alteration filing in Crown Heights (South), Brooklyn. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 11, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00257277-I1

784 Eastern Parkway

Brooklyn, NY 11213

Alteration filing · status dated Dec 27, 2020

Current record
Approved
Proposed scale
Not stated
Dwelling units
4
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00257277-I1 as a alteration filing at 784 Eastern Parkway, Brooklyn, NY 11213. Its latest published status category is Approved, dated Dec 27, 2020. The filing records 4 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Dec 27, 2020
Proposed scale
4 proposed dwelling units
Applicant of recordSee the 974 filings that name Syed Engineering, P.C.
FiledNov 8, 2019
Current recordApproved
Proposed scale4 units
Recorded cost$8,000

What the filing says

A public-record reading of the proposed work.

Proposed installation of heavy duty sidewalk shed for remedial repairs as per plans. no change in use occupancy or egress under this application. live load 300 per square feet. sidewalk shed shall comply with chapter # 33 of the 2014 code.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 4-story place of worship built in 1925, on a 6,029 sq ft lot.

Built
1925
Last altered
1992
Floors
4
Residential units
0
Building type
Place of worship
Land use
Public facilities and institutions
Zoning district
R6
Lot area
6,029 sq ft
Building area
15,500 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 12, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 4 open notices on record for this building, out of 5 notices on file; the most recent was issued Jan 20, 2024.

  • Construction

    Issued Jan 20, 2024 — ADDITIONAL INFORMATION.THERE WERE NO PERMITS ON FILE W/DOB FOR COMBINING THE 3BLDGS.FIRE SEPARATION & EGRESS WAS IN QUESTION.OWNR TO RTAIN DSGN PROF TO EVAL THE ENT BLDG&FILE DWGS TO LEGALIZE/RPAIR FIRE SEPARATION&EGRESS IF/AS REQ'D

  • Construction

    Issued Jan 20, 2024 — ADDITIONAL INFORMATION.THERE WERE NO PERMITS ON FILE W/DOB FOR COMBINING THE 3BLDGS.LOAD BEARING STRUCTURAL WALLS BTWN BLDGS HAVE BEEN ALTERED.OWNR TO RTAIN NYS PE TO EVAL ENT BLDG&FILE DWGS TO LEGALIZE/RPAIR ALL WRK IF/AS REQ'D.PERM RPAIRS TO BE PERFRMD UNDR PRMT

  • Construction

    Issued Jan 10, 2024 — STRUCTURE RENDERED NON-COMPLIANT. REAR EXTENSION HAS BEEN COMPROMISED DUE TO UNDERMINING.

  • 1 further open notice is on file. Open the source dataset for the full list.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 12, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00257277-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “Permit Entire.”

    03

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00257277-I1
BIN
3033034
BBL
3012710035
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
4
Proposed dwelling units
4