What the filing says
A public-record reading of the proposed work.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. live load 300psf.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story elevator apartment building built in 1927, with 78 homes, on a 20,200 sq ft lot.
- Built
- 1927
- Last altered
- 1992
- Floors
- 6
- Residential units
- 78
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R6
- Lot area
- 20,200 sq ft
- Building area
- 82,320 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 22, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 9 open notices on record for this building, out of 32 notices on file; the most recent was issued Jun 30, 2025.
- Construction
Issued Jun 30, 2025 — EMERGENCY WORK ORDER-OBSVD THAT ONE OF THE REAR FIRE ESCAPE CONNECTION WAS FOUND T/BE LOOSE & UNSTABLE W/CRACKED BRICKS @ PARAPET LEVEL @ THE EXP3 WALL. OWNER TO IMMED RETAIN NYSPE & DOB REG CONTRACTOR TO SECURE THE UNSTABLE REAR FIRE ESCAPE CONNECTIONS. PE T/BE ON SITE FULL TIME PROVIDING EMERGENCY WORK PROGRESS FILE APPL FOR ENG WORK
- Construction
Issued Apr 22, 2025 — EMERG WORK ORDER FOR S/W SHED PROTECTION. OBSV DETERIORATED MORTAR AROUND EXTERIOR BRICKS,CRACKED BRICKS,CRACKED MORTAR,LOOSE BRICKS, LEANING PARAPET WALLS,MISSING BRICKS OVER DOORWAY,DEFECTS IN VARIOUS AREAS OF BLDG. INSTALL OVERHEAD PROTECTION ALONG THE PERIMETER OF ALL BLDGS AND ALL EXTERIOR SIDES OF THE PREMISES
- Construction
Issued Apr 22, 2025 — CORRECTION ACTION PLAN REQ'D. OBSV HAZ COND IN MULT AREAS W/EXTERIOR PARAPET WALLS AT THE BLDG, WITH MORTAR CRACKS AROUND BRICKS,BROKEN OR LOOSE BRICKS,DAMAGE/MISSING COPPING STONE LEANING PARAPET WALL SECTION OWNER TO HIRE REG DESIGN PROF TO SUBMIT CORRECTIVE ACTION PLAN TO PROACTIVEINSP@BUILDINGS.NYC.GOV W/IN 30 DAYS ADDRESSING ALL CONDITIONS
6 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 22, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01216150-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 84,915 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01216150-I1
- BIN
- 2054898
- BBL
- 2045500027
- Postal code
- 10467 · 290 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 78
- Proposed dwelling units
- 78