NYC DOB record · X01243640-I1

808 Adee Avenue

808 Adee Avenue, Bronx, NY 10467

Alteration filing in Allerton, Bronx. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 31, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · X01243640-I1

808 Adee Avenue

Bronx, NY 10467

Alteration filing · status dated Oct 29, 2026

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing X01243640-I1 as a alteration filing at 808 Adee Avenue, Bronx, NY 10467. Its latest published status category is Recorded as completed, dated Oct 29, 2026. The published record does not state proposed stories or dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Oct 29, 2026
Proposed scale
Not stated in this filing
The building, not the filingopen housing violations, what it sold for, the owner of record and every filing at BIN 2054898Applicant of recordSee the 2 filings that name Ssd Interior Inc
FiledJun 20, 2025
Current recordRecorded as completed
Proposed scaleNot specified
Recorded costNot published

What the filing says

A public-record reading of the proposed work.

Suspended scaffold outriggersystem and materials hoistsystem for roof repairs,replacement, inspections and facade restoration works

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 6-story elevator apartment building built in 1927, with 78 homes, on a 20,200 sq ft lot.

Built
1927
Last altered
1992
Floors
6
Residential units
78
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R6
Lot area
20,200 sq ft
Building area
82,320 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 31, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 9 open notices on record for this building, out of 32 notices on file; the most recent was issued Jun 30, 2025.

  • Construction

    Issued Jun 30, 2025 — EMERGENCY WORK ORDER-OBSVD THAT ONE OF THE REAR FIRE ESCAPE CONNECTION WAS FOUND T/BE LOOSE & UNSTABLE W/CRACKED BRICKS @ PARAPET LEVEL @ THE EXP3 WALL. OWNER TO IMMED RETAIN NYSPE & DOB REG CONTRACTOR TO SECURE THE UNSTABLE REAR FIRE ESCAPE CONNECTIONS. PE T/BE ON SITE FULL TIME PROVIDING EMERGENCY WORK PROGRESS FILE APPL FOR ENG WORK

  • Construction

    Issued Apr 22, 2025 — EMERG WORK ORDER FOR S/W SHED PROTECTION. OBSV DETERIORATED MORTAR AROUND EXTERIOR BRICKS,CRACKED BRICKS,CRACKED MORTAR,LOOSE BRICKS, LEANING PARAPET WALLS,MISSING BRICKS OVER DOORWAY,DEFECTS IN VARIOUS AREAS OF BLDG. INSTALL OVERHEAD PROTECTION ALONG THE PERIMETER OF ALL BLDGS AND ALL EXTERIOR SIDES OF THE PREMISES

  • Construction

    Issued Apr 22, 2025 — CORRECTION ACTION PLAN REQ'D. OBSV HAZ COND IN MULT AREAS W/EXTERIOR PARAPET WALLS AT THE BLDG, WITH MORTAR CRACKS AROUND BRICKS,BROKEN OR LOOSE BRICKS,DAMAGE/MISSING COPPING STONE LEANING PARAPET WALL SECTION OWNER TO HIRE REG DESIGN PROF TO SUBMIT CORRECTIVE ACTION PLAN TO PROACTIVEINSP@BUILDINGS.NYC.GOV W/IN 30 DAYS ADDRESSING ALL CONDITIONS

  • 6 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 31, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing X01243640-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 90,393 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
X01243640-I1
BBL
2045500027
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
Empty in the source
Proposed dwelling units
Empty in the source