What the filing says
A public-record reading of the proposed work.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of the NYC building code. live load 300psf.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story elevator apartment building built in 1926, with 60 homes, on a 14,202 sq ft lot.
- Built
- 1926
- Floors
- 6
- Residential units
- 60
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R8
- Lot area
- 14,202 sq ft
- Building area
- 84,000 sq ft
- Historic district
- Grand Concourse Historic District
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 20, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 17 open notices on record for this building, out of 48 notices on file; the most recent was issued Jun 24, 2026.
- Construction
Issued Jun 24, 2026 — FAILURE TO MAINTAIN BLDG IN A CODE COMPLIANT MANNER. AT THE TIME OF INSPECTION, OBSERVED ON EXP 1,2, 3 CRACKS, SPALLING, DEFECTIVE BRICK WORK IN PARAPET BRICK, ARCH & COPING STONE. ALL COPING STONES ON EXP1, 2, & 3 ARE DEFECTIVE & DEINTERGRATING. REMEDY: REPAIR AND/OR REPLACE ALL DEFECTIVE MASONRY WORK ON FACADE
- Construction
Issued Jan 24, 2025 — PARTIAL VACATE ORDER DUE TO THE HAZARDOUS CONDITIONS SUCH AS CRACKED & SPALLING MASONRY BRICK & CRACKED SPALLING MASONRY STUCCO ON CHIMNEY EXP4 NORTH COURTYARD. THESE CONDITIONS HAVE MADE THE COURTYARD EXP4 NORTH UNABLE TO BE OCCUPIED. REMEDY:VACATE ENTIRE COURTYARD @ EXP4 NORTH COURTYARD TO BE USED IN EMERGENCY ONLY
- Construction
Issued Jan 23, 2025 — EMERGENCY WORK ORDER DUE TO CRACKED/SPALLING BRICK/STUCCO AT CHIMNEY OVERLOOKING EXP4 NORTH COURTYARD ABOVE BSMT ENTRY DOORWAY. REMEDY: IMMEDIATELY TAKE & PROVIDE ADEQUATE SAFETY MEASURES TO SECURE/PROTECT THE PUBLIC AT EXP 4 NORTH COURTYARD. IN ADDITION, IMMEDIATELY REPAIR DEFECTIVE FACADE UNDER THE FULL SUPERV OF A NYS LICENSED PROFESSIONAL
14 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 20, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X00342333-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X00342333-I1
- BIN
- 2002904
- BBL
- 2024740028
- Postal code
- 10451 · 124 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 60
- Proposed dwelling units
- 60








