What the filing says
A public-record reading of the proposed work.
Storage of material / equipment (knock down shantys) on top of heavy duty shed. storage shall not exceed 150 psf. shed filed under separate application. storage shall comply with ch#33 of the NYC bc. no change in use, occupancy or egress under this app.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 9-story other built in 1933, on a 129,609 sq ft lot.
- Built
- 1933
- Floors
- 9
- Residential units
- 0
- Building type
- Other
- Land use
- Public facilities and institutions
- Zoning district
- R8
- Lot area
- 129,609 sq ft
- Building area
- 504,000 sq ft
- Historic district
- Grand Concourse Historic District
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 22, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 48 open notices on record for this building, out of 256 notices on file; the most recent was issued Feb 17, 2023.
- Hazardous condition (facade)
Issued Feb 17, 2023 — CYCLE 9B UNSAFE REPORT FILED
- Elevator
Issued Oct 21, 2021
- Elevator
Issued Oct 21, 2021
45 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 22, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01072945-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01072945-I1
- BBL
- 2024680001
- Postal code
- 10451 · 124 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 0
- Proposed dwelling units
- 0