NYC DOB record · X01052421-I1

864 East 164 Street

864 East 164 Street, Bronx, NY 10459

New building filing in Longwood, Bronx. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedNew building

NYC Department of Buildings · w9ak-ipjd · accessed Nov 21, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · X01052421-I1

864 East 164 Street

Bronx, NY 10459

New building · status dated Nov 19, 2026

Current record
Approved
Proposed scale
4 stories
Dwelling units
5
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing X01052421-I1 as a new building at 864 East 164 Street, Bronx, NY 10459. Its latest published status category is Approved, dated Nov 19, 2026. The filing records 4 proposed stories and 5 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
New building
Latest status
Approved
Latest status date
Nov 19, 2026
Proposed scale
4 proposed stories and 5 proposed dwelling units
The building, not the filingopen housing violations and every filing at BIN 2005222Applicant of recordSee the 14 filings that name Build Tech Professional Corp
FiledNov 22, 2024
Current recordApproved
Proposed scale4 stories
Recorded costNot published

What the filing says

A public-record reading of the proposed work.

New building 4 story, cellar, and penthouse, 5 family on this existing zoning/tax lot.

Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 4-story walk-up apartment building built in 2025, with 5 homes, on a 1,398 sq ft lot.

Built
2025
Last altered
2025
Floors
4
Residential units
5
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
R7-1
Lot area
1,398 sq ft
Building area
4,005 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 21, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 2 open notices on record for this building, out of 5 notices on file; the most recent was issued Jan 2, 2013.

  • Fail to certify class

    Issued Jan 2, 2013 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION

  • Unsafe

    Issued Dec 11, 2007

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 20, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing X01052421-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 23 days of being filed and a quarter take longer than 4 months, measured across 99,111 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
X01052421-I1
BBL
2026900142
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
4
Existing dwelling units
Empty in the source
Proposed dwelling units
5
General construction