What the filing says
A public-record reading of the proposed work.
Installation of heavy duty sidewalk shed. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story elevator apartment building built in 1938, with 60 homes, on a 17,500 sq ft lot.
- Built
- 1938
- Floors
- 6
- Residential units
- 60
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R6A
- Lot area
- 17,500 sq ft
- Building area
- 65,976 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 29, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 4 open notices on record for this building, out of 21 notices on file; the most recent was issued Oct 21, 2026.
- Construction
Issued Oct 21, 2026 — FTM BLDG IN A CODE COMPLIANT MANNER-OBSVD 3 CRAKCS ON PARAPET WALLS, ONE BEING A TRU CRACK ON EXP2-3 CORNER. AN ANNUAL PARAPET OBSERVATION REPORT IS REQ'D TO BE COMPLETED ANNUALLY STARTING IN 2024. SUBMIT ANNUAL PARAPET OBSERVATION REPORT FOR 2025 TO BE REC'D BY DOB NO LATER THAN 11/04/2026
- Construction
Issued Oct 21, 2026 — CORRECTIVE ACTION PLAN REQ'D-OBSVD 2 STEP CRACKS ON 1FL LEFT AND RIGHT SIDES OF MAIN ENTRY WAY, 3 CRACKS ON PARAPET WALL, ONE BEING A TRU CRACK. OWNER TO IMMED RETAIN A REG DESIGN PROF IN GOOD STANDING W/DOB& NYS TO EVAL THE ENTIRE BLDG AND SUBMIT A CORRECTIVE ACTION PLAN BY 11/21/2026
- Construction
Issued Oct 21, 2026 — EMERGENCY WORK ORDER-IMMED HAZ CONDITION, THE PARAPET ON EXP2-3 CORNER HAVE TRU CRACK AND INDICATES STRUCT DEFECT WITH THE RISK OF COLLAPSE. OWNER TO IMMED GET DOB REG GC TO INSTALL S/W SHED ON THE FULL WIDTH OF EXP3 APPROX 165LF, START WORK IMMED AND CONTINUE UNTIL COMPLETE
1 further open notice is on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 29, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing Q01479430-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 88,832 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- Q01479430-I1
- BIN
- 4194984
- BBL
- 4093040011
- Postal code
- 11418 · 137 filings
- Review type
- Professional Certification
- Existing stories
- 6
- Proposed stories
- 6
- Existing dwelling units
- 59
- Proposed dwelling units
- 59