88 East 2 Street

88 East 2 Street, Manhattan, NY 10003

New building filing in East Village, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedNew building

NYC Department of Buildings · w9ak-ipjd · accessed Sep 19, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01010741-I1

88 East 2 Street

Manhattan, NY 10003

New building · status dated Sep 16, 2026

Current record
Approved
Proposed scale
8 stories
Dwelling units
25
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01010741-I1 as a new building at 88 East 2 Street, Manhattan, NY 10003. Its latest published status category is Approved, dated Sep 16, 2026. The filing records 8 proposed stories and 25 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
New building
Latest status
Approved
Latest status date
Sep 16, 2026
Proposed scale
8 proposed stories and 25 proposed dwelling units
The building, not the filingopen housing violations, apartment sizes, the owner of record and every filing at BIN 1091797Applicant of recordSee the 194 filings that name Gerald Caliendo Architects
FiledMar 8, 2024
Current recordApproved
Proposed scale8 stories
Recorded costNot published

What the filing says

A public-record reading of the proposed work.

Proposed (8) Seven Story Mixed Use Building with (25) Twenty-Three Dwelling units, Commercial use on the first floor, cellar and sub-cellar floors, Residential use on floors two-Eight.

Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 7-story elevator apartment building built in 2025, with 22 homes, on a 2,900 sq ft lot.

Built
2025
Last altered
2025
Floors
7
Residential units
22
Building type
Elevator apartment building
Land use
Mixed residential and commercial
Zoning district
R7A
Lot area
2,900 sq ft
Building area
21,328 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 19, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 25 open notices on record for this building, out of 25 notices on file; the most recent was issued Mar 3, 2015.

  • Low pressure boiler

    Issued Mar 3, 2015 — VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT

  • Low pressure boiler

    Issued Mar 3, 2015 — VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT

  • Low pressure boiler

    Issued May 15, 2014 — VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT

  • 22 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01010741-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01010741-I1
BBL
1004440042
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
8
Existing dwelling units
Empty in the source
Proposed dwelling units
25
General construction